Refurbishment of several residential and communal areas to form a new Gymnasium cafeteria and modern accommodation units.
The brief also entailed the removal of significant load bearing ground floor walls to form ancillary circulation routes.
A second gymnasium below these areas which remained live throughout the project. Required complex cantilevered works to be designed.